Editorial Policy: How Wakkiro Cost Guides Are Written and Checked
Wakkiro's cost guides exist to help Malaysian homeowners and small contractors budget a build or renovation and check a quotation. This page explains where our numbers come from, who writes and checks the guides, how we use AI writing assistance, and how we correct mistakes. Versi Bahasa Malaysia di bawah.
1. Where our numbers come from
- Our rate book: material prices, labour day rates, crew output, wastage, preliminaries and plant hire for Selangor/KL and Johor, maintained by the Wakkiro team.
- Engineer data: supplier and site prices and ten engineer-priced reference projects from our site engineer, Rasydan Abdulah. Real projects are only described anonymously, never with owner names or addresses.
- Public sources, only when we have no figure of our own: official sources first (DOSM, MOF, BQSM, CIDB, local councils), then published market ranges. These are always labelled "market range" and linked or named.
We never invent statistics, surveys, testimonials or case studies. If we are unsure, we give a range and say what moves it.
2. Who writes and checks a guide
Topics are chosen from what people in Malaysia search for and ask us. Drafts are prepared with AI writing assistance working from the sources above. Every guide is then reviewed and edited by Dr. Daing Hanum before it is published. The review checks that:
- every price can be traced to the rate book, the engineer data or a named public source;
- every worked example is recalculated and adds up exactly;
- a guide does not repeat a topic another guide already covers (we merge them instead);
- titles only promise what the page actually answers.
Guides that use engineer prices say so in the text. The estimator itself is built and tested by our tech lead, Dr. Syafiq Affandi.
3. Updates and corrections
Prices change. We revisit guides when our rate book changes, when official data is released, or when a reader sends a real quotation that shows we are off. Material changes are recorded in the changelog with the date and what changed, and the guide's "updated" date is changed only when the content actually changes.
To report an error, email hello@wakkiro.ai with the guide, the item, your location and the price you were quoted.
4. Independence and advertising
We do not accept payment from contractors or suppliers to appear in a guide, and brand names in price tables are there only because they are what is sold and quoted in Malaysia. Advertising on the blog is clearly separated from the content and never decides what we write.
Dasar Editorial (Bahasa Malaysia)
Sumber angka. Semua harga datang daripada jadual kadar Wakkiro, data jurutera tapak kami (Rasydan Abdulah) atau sumber awam yang dinamakan seperti DOSM, MOF, BQSM, CIDB dan PBT. Julat pasaran sentiasa dilabel sebagai julat pasaran. Kami tidak mereka statistik, tinjauan atau testimoni.
Penulisan dan semakan. Draf disediakan dengan bantuan penulisan AI berdasarkan sumber di atas, kemudian disemak dan disunting oleh Dr. Daing Hanum sebelum diterbitkan. Setiap harga disemak sumbernya dan setiap contoh kiraan dikira semula.
Pembetulan. Jika harga dalam panduan tidak sepadan dengan kawasan anda, emel hello@wakkiro.ai dengan item, lokasi dan harga sebut harga. Perubahan direkodkan dalam changelog.
Kebebasan. Kami tidak menerima bayaran daripada kontraktor atau pembekal untuk dimuatkan dalam panduan. Iklan diasingkan dengan jelas daripada kandungan.
Wakkiro is operated by Rumah Kampong Sdn. Bhd. (SSM 202301043520 (1537436-K)), Pontian, Johor. About us · Contact