Home › About › Rasydan Abdulah

Rasydan Abdulah

Site engineer, Wakkiro · LinkedIn

Rasydan Abdulah is the site engineer at Wakkiro. He brings the on-site view: what materials actually cost from suppliers, how work is priced by contractors, and how built-up area is measured on real drawings.

What he does at Wakkiro

Guides that use his project and price data

Wakkiro is operated by Rumah Kampong Sdn. Bhd., Pontian, Johor. More about the team.