Construction Quotation Template Malaysia 2026: How to Prepare a Contractor Quote, With a Priced Sample

Published 28 November 2026 · 9 min read · By Dr. Daing Hanum · Price data: Rasydan Abdulah, site engineer
Malaysian contractor reviewing a printed itemised quotation with a homeowner at a table in a terrace house

A professional construction quotation in Malaysia lists every item with quantity, unit, rate and amount. It also shows preliminaries, PC and provisional sums, exclusions, payment stages, a validity period and the SST position. The sample below, a 6x10 ft bathroom renovation in Selangor, comes to RM10,327.27: RM7,202.27 of measured work plus RM3,125 of PC and provisional sums. Service tax does not apply because it is a house.

This guide is for contractors and tukang who price residential jobs. It gives the structure line by line, shows how each rate is built from day rates and output, and sets out the current SST rules for construction services.

What a construction quotation must contain

A residential quotation is an offer the client can accept by signing it, so it has to be complete on paper. A good one has these parts, in this order:

  1. Header: company name, SSM number, CIDB grade and registration number if you have one, address, phone, and SST registration number only if you are registered.
  2. Client and site: name, site address, quote number, date, and revision number (Rev 0, Rev 1) so nobody prices from an old copy.
  3. Scope summary: two or three lines saying what the job is and which drawings, photos or site visit the price is based on.
  4. Bill of quantities: item number, description, quantity, unit, rate and amount, grouped by trade.
  5. Preliminaries: protection, debris disposal, cleaning, permits, scaffolding.
  6. PC and provisional sums: money for items not yet chosen or not yet known.
  7. Exclusions: what the price does not cover.
  8. Programme: start date and working days.
  9. Payment terms: stages tied to finished work, not dates.
  10. Validity: how long the price holds.
  11. Tax line: SST charged, or why it is not.
  12. Warranty and acceptance: defects period, signature blocks for both parties.

Item 4 is where most small contractors lose jobs or money. A single line reading "Renovate bathroom, lump sum RM10,000" cannot be compared, cannot be varied and invites the client to haggle on the total. Quantities and rates let you defend each line.

Sample quotation: 6x10 ft bathroom renovation in Selangor

The job: full refurbishment of an existing 6 ft x 10 ft bathroom (5.57 m²) in a landed terrace house. Walls are tiled to a 2.4 m ceiling, which is 21.83 m² after deducting one 750 x 2100 mm door. The WC and shower stay where they are. Rates are built from the Wakkiro rate book for Selangor and include about 20% overhead and profit.

ItemDescriptionQtyUnitRate (RM)Amount (RM)
A. Preliminaries
A1Protection to floors and access route (polythene and 9 mm plywood)1item330.00330.00
A2Disposal of debris by 10-wheel lorry, including tipping fee1trip420.00420.00
A3Final cleaning on completion1item150.00150.00
B. Demolition
B1Hack existing wall and floor tiles and bedding, cart to lorry27.40m²21.00575.40
B2Remove existing sanitaryware, fittings and ceiling1item150.00150.00
C. Wet works and waterproofing
C150 mm cement-sand screed laid to falls to floor trap5.57m²40.00222.80
C212 mm cement-sand plaster to walls after hacking21.83m²29.00633.07
C3Flexible cementitious waterproofing, 2 coats, to floor, 300 mm upstand and shower walls to 1.8 m; 24–48 hour ponding test included11.70m²64.00748.80
D. Plumbing
D1Replace cold and hot water supply pipes and floor trap, connect to existing points1item1,100.001,100.00
D2Install sanitaryware supplied under PC sum H11item320.00320.00
E. Tiling
E1Porcelain floor tiles 300x300, supply and lay with adhesive and grout5.57m²72.00401.04
E2Ceramic wall tiles 300x600 to full height, supply and fix21.83m²70.001,528.10
F. Ceiling
F16 mm cement board ceiling on frame, with beading5.57m²58.00323.06
G. Electrical
G1Water heater point with isolator (heater unit by client)1no300.00300.00
Subtotal, measured work A–G7,202.27
H. Prime cost and provisional sums
H1PC sum: supply of WC, basin, shower mixer set, mirror and accessoriessum2,500.00
H2Profit and attendance on H15%125.00
H3Provisional sum: repairs to concealed pipes or wall found damaged after hackingsum500.00
Total quotation10,327.27
Service taxNot applicable: residential building

Check the sums: sections A to G are 900.00 + 725.40 + 1,604.67 + 1,420.00 + 1,929.14 + 323.06 + 300.00 = 7,202.27. Adding 2,500.00 + 125.00 + 500.00 gives 10,327.27. Every amount is quantity × rate, so the client can check any line with a calculator.

How the rates in the sample were built

Each selling rate starts from a direct cost of materials plus labour. Labour comes from day rates and output per day. A tiler and assistant cost RM150 + RM100 = RM250 a day. They lay about 12 m² of floor tiles a day, or 8 m² of wall tiles, so laying costs RM20.83 per m² on the floor and RM31.25 on the wall.

LineDirect cost (RM)How it is builtQuoted (RM)
B1 Hacking480.002 labourers × 2 days × RM120575.40
C3 Waterproofing625.002 sets × RM195 + 1 plaster gang-day RM235748.80
D1 Plumbing920.00Plumber + helper 2 days × RM260 + RM400 pipes and fittings1,100.00
E2 Wall tiles1,270.00Tiles and adhesive RM588 + 21.83 m² × RM31.251,528.10
All measured work A–G5,987.26Sum of every line's direct cost7,202.27

The measured work carries a markup of 20.3% on cost, which is 16.9% of the selling price. Confusing those two numbers is a common way to under-price: if you want 20% of the selling price, divide cost by 0.80 instead of multiplying by 1.20. For other ways to protect that figure without cutting the rate, see how contractors win jobs without cutting margin.

The plumbing fittings allowance (RM400) and the sanitaryware PC sum (RM2,500) are market figures, not rate-book rows. Replace them with your own supplier prices before you send anything.

Preliminaries: the lines small contractors forget

Preliminaries are the costs of running the job rather than building it. On a bathroom they are small, but leaving them out of the quote takes them out of your margin. In the sample they add RM900, about 9% of the total.

Bathroom floor flooded for a ponding test after waterproofing, with the water level marked on the wall
Bathroom floor flooded for a ponding test after waterproofing, with the water level marked on the wall

PC sums, provisional sums and exclusions

A prime cost (PC) sum is money for an item the client will choose later, such as sanitaryware. You fix the amount; the client picks the products; the account is adjusted to the actual invoice. Always add a separate line for your profit and attendance on it (5% in the sample), or you handle, store and install RM2,500 of goods for nothing.

A provisional sum covers work you know may be needed but cannot measure yet, like rotten pipes behind tiles. It is spent only if the work happens and is valued at the agreed rates. The abbreviations clients see in a BOQ, such as PC, PS, Prov and Item, are explained in our BOQ abbreviations guide.

Included in the sample price:

Not included unless added:

Payment terms and validity

Tie each stage to work the client can see. For the sample job:

StageTrigger%Amount (RM)
1Quote accepted, before materials are ordered303,098.18
2Waterproofing passes the ponding test303,098.18
3Tiling and sanitaryware installed303,098.18
430 days after handover, defects cleared101,032.73
Total10,327.27

The adjustment for the PC and provisional sums goes into the final stage, so state that too. Homeowners compare these schedules, and our guide to renovation payment schedules is written for them. Validity of 30 days is common for wet works. If tile or steel prices are volatile, write "materials priced at date of quote" and keep it to 14 days. A programme of 10 working days is realistic here, since the ponding test alone takes one to two days.

SST on construction quotations in 2026

Since 1 July 2025, construction work services are a taxable service at 6% under Group L of the Service Tax Regulations. Customs updated its Guide on Construction Work Services on 17 March 2026. What it says for small contractors:

So the sample bathroom shows "Service tax: not applicable, residential building". If a registered contractor did the same job as a lump sum in a shop-lot office, it would be RM10,327.27 + 6% (RM619.64) = RM10,946.91. Itemising the materials at cost would lower that. These rules have changed several times since 2025, so confirm your own position with your tax agent.

Check your quote the way the client will

  1. Re-measure one area. Clients now measure walls themselves. 6x10 ft tiled to 2.4 m is about 22 m²; a quote showing 35 m² gets questioned or rejected.
  2. Name the waterproofing. Product type, coats, upstand height and ponding test. "Waterproofing" alone looks like a corner cut.
  3. Separate the PC sums, so your labour is compared fairly with another tukang who assumed cheaper fittings.
  4. Add the arithmetic twice. One wrong total and the client distrusts every rate.
  5. Read the exclusions aloud. If one would surprise the client, explain it before they sign.

Homeowners using this checklist will see the same 6x10 ft bathroom priced at RM9,190–RM10,380 in our bathroom renovation guide. That is why your quote should be in that range or explain why it is not.

Spreadsheet or estimating software?

A spreadsheet with your own rate library, one tab per trade, is enough for bathroom and kitchen jobs. It starts to fail on extensions and new houses, where measuring a plan takes longer than pricing it. Our comparison of estimating software for small contractors in Malaysia covers when to move up. For drawing-based jobs, you can upload the client's plan to Wakkiro to get the quantities and a draft BOQ, then put your own rates and terms on it.

What would your project actually cost?

Upload a drawing or describe the job — Wakkiro builds an itemised BOQ at current Malaysian rates, free.

Estimate My Project →

Frequently Asked Questions

How do I prepare a construction quotation in Malaysia?

Measure the work, build each rate from materials plus labour output, add preliminaries and your overhead and profit, then list items with quantity, unit, rate and amount by trade. Finish with PC and provisional sums, exclusions, payment stages, validity, SST status and signature blocks.

Do contractors charge SST on house renovation?

No. Under the Customs Guide on Construction Work Services, work on residential buildings, including renovating a house, is not subject to the 6% service tax. SST applies to commercial and other non-residential work by contractors registered under Group L.

What is the SST registration threshold for contractors?

A contractor must register when taxable construction services exceed RM1.5 million in any 12 months. Residential construction work is excluded from that total.

How long should a contractor quotation be valid?

Most residential quotations are valid for 14 to 30 days. Use the shorter period when material prices such as steel, cement or tiles are moving, and state that prices are at the date of quote.

What is the difference between a PC sum and a provisional sum?

A PC sum is an allowance for items the client will choose, such as sanitaryware, adjusted to the actual invoice plus a profit and attendance percentage. A provisional sum covers work that may be needed but cannot be measured yet, and is spent only if the work is done.

What payment terms are normal for a renovation quotation?

A common pattern is 30% on acceptance, then progress payments at visible milestones such as waterproofing passed and tiling finished, with about 10% held until defects are cleared after handover.

Get a full itemised estimate, free

Line-by-line BOQ for a new build, extension or renovation — in minutes.

Start Now →
About this guide. Written and reviewed by Dr. Daing Hanum, with price data from our site engineer Rasydan Abdulah. Figures come from the Wakkiro rate book and the sources named in the article. Drafts are prepared with AI writing assistance and checked before publishing; see our editorial policy. Seeing a different price in your area? Tell us.