Describe / Upload
Describe your project — or upload a PDF drawing, image, or hand sketch if you have one. New build, renovation, or mixed.
DRAWING OPTIONALFor homeowners and residential contractors. Tell us your house size, storeys and location — get a full BOQ with quotation-ready pricing. Have drawings? Upload them and the AI measures quantities for you.
No drawing needed — from idea to BOQ to quotation in minutes.
Three answers — instant budget range. No plans or technical knowledge needed.
Most homeowners don’t have plans yet — and that’s fine. Both paths end with the same full BOQ and quotation.
Just answer the basics: project type, built-up area, storeys, state and quality tier. The calibrated engine prices all 11 trade groups from your answers — budget range in seconds, full BOQ in one click.
NO DRAWING NEEDEDDrop in a PDF, photo or even a hand sketch. The AI reads rooms, dimensions and scope like a QS, measures the quantities and generates your estimate automatically.
PDF · JPG · PNG · HAND SKETCHStart with a drawing or just your project basics — every estimate follows the same transparent pipeline, so a QS can audit it and a homeowner can follow it.
Describe your project — or upload a PDF drawing, image, or hand sketch if you have one. New build, renovation, or mixed.
DRAWING OPTIONALLayout, gridlines, room labels and dimensions are parsed. The project is classified before any pricing.
CLASSIFY FIRST, PRICE SECONDWalls, floor areas, roof area, doors, windows and MEP allowances are measured with confidence scores — or derived from your built-up area if no drawing is uploaded.
QUANTITY TAKE-OFFA full Bill of Quantities across 11 trade groups — preliminaries to handover — with renovation items separated.
11 TRADE GROUPSCurrent material, labour, plant and preliminaries rates are pulled from Crowdsource — the primary rate basis.
GOOGLE SHEETS = PRIMARYContingency and contractor OHP applied, budget rounded, and exported as PDF, Excel, CSV or shareable link.
QUOTATION-READYFill in the basics below — that’s all you need for a full estimate. Have drawings? Upload them and the AI measures quantities directly.
Every quantity carries a confidence score, so you know which numbers to trust and which to verify on site.
Medium-confidence items are flagged in the BOQ for site verification before contract award.
Every line shows its quantity, rate, rate basis and AI confidence. Click a group to expand.
CS Crowdsource calibrated AI Takeoff Drawing-detected Parametric Balance Unmeasured remainder QS Benchmark
Adjust contingency and OHP, switch labour scenarios, and watch the final quote update live.
Crew-days per trade = the row labour component ÷ the Crowdsource crew day-rate for that trade (Scenario A mix). Scenario B/C labour = the same crew-days × that scenario's crew day-rate — identical crews, different labour pricing. Implied output (ft² of BUA per crew-day) is derived from the calibrated model, not a measured site productivity takeoff; confirm against the contractor's programme before contract award.
Nine key activities from design to handover, sequenced the way Malaysian residential projects actually run.
One primary source of truth, one external benchmark. Never blended, never guessed.
Crowdsource is the primary rate reference. AI takeoff rows use drawing-detected quantities priced against sheet rates; parametric fallback rows cover items the drawing didn't specify. Rows tagged CS are calibrated to the maintained rate book; rows tagged AI Takeoff come from the uploaded drawing.
Replace any of the four Crowdsource rate books with your own Google Sheet (same layout: section headers, then DESCRIPTION / UNIT / RATE / REMARKS columns). Paste the share link — “anyone with the link can view” is enough. Your rates take priority per book; Crowdsource fills anything your sheet doesn’t cover.
No Google Sheet? Upload an Excel, CSV, PDF or Word rate list — or paste a supplier price-list web link. AI reads the document, picks the latest non-zero price per item, and your rates price matching BOQ items first, before Crowdsource.
Cement, steel, bricks, tiles, sanitary — updated monthly.
PRIMARY RATE BASISInsurance, permits, site overhead norms.
PRIMARY RATE BASISPer-trade daily and unit labour rates by region.
PRIMARY RATE BASISExcavator, crane, scaffolding hire rates.
PRIMARY RATE BASISUsed only to sanity-check your rates against market. Benchmark rates never enter the BOQ — lines tagged QS are flagged for your review.
Published per-m² benchmarks by building type.
BENCHMARKCross-check outlier rates per trade group.
BENCHMARKState-level cost adjustment factors.
BENCHMARKFlags when your rate drifts >15% from market.
BENCHMARKEverything the client, banker, or contractor needs — in the format they expect.
A real pipeline run on dummy data, so you can judge the output quality before running your own project.
We check Wakkiro against real Malaysian house projects: the built-up area measured from the CAD drawings, and the price estimated by a practising site engineer. These are the latest results from the live website (1 October 2026).
Accuracy = 100% minus the difference from the CAD drawing (built-up area) or from the site engineer's price. Renovation projects are priced on the engineer's own scope (extension area, altered rooms). Hand-drawn sketches are the hardest case for any tool to measure. We show every result, and update these figures as more projects are verified.
Typical installed prices used by our rate book. Each line links to a full guide with breakdowns, hidden costs and tips.
Plain-language guides for homeowners and contractors, in Bahasa Melayu and English.
BMHarga Bina Rumah Sekaki Persegi 2026RM180–RM350+/ft² by specification and state
ENCost to Build a House in Malaysia 2026Full breakdown with a real BOQ example
BMHarga Wiring Rumah 2026RM80–RM150 per point and full rewiring budgets
BMHarga Bumbung Metal Deck & GentingInstalled price per ft² and when trusses need replacing
BMCara Semak Sebut Harga KontraktorRead a contractor quotation like a QS
BMJadual Bayaran Kontraktor RenovationWhat a fair payment schedule looks likeQuick answers on building, renovation and how Wakkiro prices your project.
Get a free estimate →Most landed homes cost between RM180 and RM350+ per square foot to build in 2026. A basic specification starts around RM180–RM230/ft², a standard specification is about RM250–RM330/ft², and premium finishes go higher. State, number of storeys and site conditions move the price.
We test Wakkiro against real Malaysian projects priced by a practising site engineer. In the latest check, the built-up area was within 2% on 100% of projects and the total price was within ±10% on 80% of projects, with an average price difference of about 6%. Hand-drawn sketches are the hardest case.
No. You can describe the project (built-up area, storeys, finish quality) and get a full parametric estimate. Uploading a floor plan or PDF lets the AI measure the built-up area, rooms, doors and windows, which makes the estimate more reliable.
A ground-floor extension typically costs RM150–RM220 per square foot and an upper-floor extension RM220–RM320 per square foot in 2026, before local authority (PBT) approval fees.
Electricians usually charge RM80–RM150 per point (switch, socket or light) including cable and labour. Full rewiring of a typical terrace house is about RM6,000–RM15,000.
Installed metal deck roofing is about RM14–RM22 per square foot and concrete roof tiles about RM28–RM45 per square foot. Replacing rotten timber trusses adds to the cost.
From a crowdsource-maintained Malaysian rate book of material, labour and plant prices per state, calibrated against real project prices. Anything the drawing does not show is covered by clearly labelled allowances.
Yes. The BOQ lists every work item with quantity, unit and rate, so you can compare contractor quotes line by line instead of only comparing totals.
Wakkiro is an AI construction cost estimator built for Malaysian homes by a Malaysia-based team. It turns a house plan — or a short description — into an itemised Bill of Quantities, priced with a Malaysian rate book of materials, labour and plant, and checked against real projects priced by site engineers.
Log in to your Wakkiro account
Step 1 of 2 — who are you estimating for?
Select one to continue
We sent a verification link to .
(Demo — no real email is sent.)
Here's what's happening with your projects.
Start from a full drawing, or price specific materials line by line.
Sample unit rates pre-filled from the Crowdsource rate references. Edit any rate or quantity.
| Material | Quantity | Unit | Unit rate (RM) | Total |
|---|
Your BOQ summary and budget are attached automatically.
You'll be notified when quotations arrive. (Demo — no real email was sent.)
View quotations received →Three quotations received against your AI estimate of RM 316,000.
| Select | Contractor | Quoted price | vs AI estimate | Programme | Notes |
|---|---|---|---|---|---|
| RM 309,800 | −2.0% | 9 months | CIDB G4 · 12-mo defect liability | ||
| RM 322,500 | +2.1% | 8 months | CIDB G5 · includes premium finishes | ||
| RM 331,000 | +4.7% | 7.5 months | CIDB G5 · fastest programme |
Your accepted quotation vs the original AI estimate.
Public and registered activity across wakkiro.ai — last 30 days.
| Event | Total | Registered | Guest |
|---|
| Sample | Verdicts | Accurate | Inaccurate | Accuracy | Corrections active | Last correction | Version | Comments |
|---|
| When | Drawing | Component | Your comment | Field | Lesson rule | Status |
|---|
| When | Project | User | Type | Location | BUA ft² | Total RM | Edited | Added | Removed | Detail |
|---|
| When | User | Source name | Kind | Rows | Method | Active |
|---|
| When | Event | User | Page |
|---|
| Name | Projects | Joined |
|---|