Panduan Kos Pembinaan & Renovation Malaysia

Harga sebenar pasaran 2026 untuk pemilik rumah dan kontraktor — bina rumah, extension, renovate, sebut harga dan BOQ. Construction & renovation cost guides for Malaysia, in Bahasa Melayu and English.

Paling Popular · Most read

Harga Bahan & Upah · Material & Labour Prices

Kos Bina Rumah · Building Cost

Renovation & Extension

EN

Kitchen Renovation Cost Malaysia 2026: Condo & Terrace

A 10 ft L-shape condo kitchen costs about RM17,500–RM18,000; a terrace wet + dry kitchen about RM37,600–RM38,700.…

9 min read
EN

Bathroom Renovation Cost Malaysia 2026: Condo & Landed

A full rebuild of a 6x8 ft condo bathroom costs about RM9,200–RM10,400 at standard spec. Itemised: hacking,…

9 min read
BM

Kos Renovate Bilik Air 2026: Harga 5x8 & 6x10 Kaki

Renovate bilik air 6x10 kaki tahap standard: sekitar RM9,200–RM10,400. Pecahan kos hacking, kalis air, paip,…

9 minit
BM

Kos Tambah Bilik & Extension Rumah 2026 (RM150–RM280/ft²)

Kos extension rumah 2026: RM150–RM280 setiap kaki persegi. Kos tambah bilik belakang, dapur basah, extension atas…

10 minit
BM

Kos Renovate Dapur 2026: RM8k Hingga RM60k — Apa Beza?

Kos ubah suai dapur di Malaysia 2026: dapur asas RM8k–RM15k, standard RM18k–RM35k, premium RM40k–RM60k+. Pecahan kos…

10 minit
EN

House Renovation Cost Malaysia 2026: Full Breakdown by Scope

Renovation costs in Malaysia 2026: light refresh RM20k–RM50k, mid renovation RM60k–RM120k, full gut renovation…

10 min read
EN

Home Extension Cost Malaysia 2026: RM150–RM320 Per ft²

Extending your house in Malaysia costs RM150–RM220/ft² for ground floor and RM220–RM320/ft² for upper floor…

10 min read
EN

Shoplot and Heritage Renovation Cost in Malaysia

Why shoplot and heritage renovation costs in Malaysia run higher per square foot: structure, heritage rules,…

7 min read
BM

Bahan Binaan Murah vs Tahan Lama: Mana Lebih Jimat?

Bahan binaan murah vs tahan lama: contoh jubin seramik vs porselin dan metal deck vs genting konkrit, kos jangka…

6 minit

Sebut Harga & BOQ · Quotations & BOQ

Untuk Kontraktor · For Contractors

Berapa kos projek anda? / What will your project cost?

Jana BOQ penuh percuma dalam 2 minit — tiada lukisan diperlukan. Full itemised estimate, free, no drawing needed.

Kira Sekarang / Estimate Now →