Dr. Daing Hanum
Dr. Daing Hanum is the author and content lead at Wakkiro. She writes and edits the cost guides on the Wakkiro blog, in Bahasa Malaysia and English, and decides what gets published.
What she does at Wakkiro
- Chooses guide topics from what Malaysian homeowners and contractors search for and ask us.
- Writes and edits every guide, working from our rate book and the project prices supplied by our site engineer, Rasydan Abdulah.
- Checks that each price is traced to a source, that market ranges are labelled as such, and that worked examples add up before a guide goes live.
- Updates guides when prices move or readers send real quotations, and records the change in the changelog.
How guides are prepared, including how AI writing assistance is used and reviewed, is set out in our editorial policy.
Guides by Dr. Daing Hanum
- What an Architectural Drawing Is Actually Worth to Your Construction Estimate
- Bahan Binaan Murah vs Tahan Lama: Kenapa Bahan Paling Murah Tak Semestinya Pilihan Paling Jimat
- Bathroom Renovation Cost Malaysia 2026: Condo and Landed, Bathtub and Shower, Itemised
- Belanjawan 2027 dan Rumah Anda: Apa Yang Diumumkan, dan Berapa Kesannya kepada Kos Bina Rumah dan Renovate
- Best Construction Cost Estimator in Malaysia 2026: A Fair Scorecard and a One-House Test
- BOQ Abbreviations in Malaysia: QRO, NR, RO, PC Sum, Provisional Sum and the Rest, Explained with a Real Bill
- Cara Semak Sebut Harga Kontraktor Seperti QS, dan Kenapa Tiga Kontraktor Beri Tiga Harga Berbeza
- Construction Cost Malaysia 2027: Forecast Cost per sq ft by Building Type, State and Scenario
- Construction Quotation Template Malaysia 2026: How to Prepare a Contractor Quote, With a Priced Sample
- Cost to Build a Bungalow in Malaysia 2026: Price per sq ft, Real Projects and a Full Budget
- Cost to Build a House in Malaysia 2026: Real Prices Per Square Foot
- Estimating Software for Small Contractors in Malaysia: What Actually Works
- Home Extension Cost Malaysia 2026: What You'll Really Pay
- Harga Atap Genting 2026: Harga Sekaki Genting Konkrit, Tanah Liat dan Metal, Aksesori dan Upah Pasang
- Harga Bahan Binaan 2026: Senarai Harga Simen, Bata Merah, Pasir, Batu, Besi Bar dan Konkrit Readymix
- Harga Bumbung Metal Deck 2026: Harga Sekaki, Upah Pasang dan Contoh Kiraan Rumah Teres
- Harga Plaster Siling Sekaki 2026: Siling Gypsum, Upah Pasang, Cornice dan L-Box, dengan Kiraan Ruang Tamu dan Seluruh Rumah
- How Contractors Win Jobs Without Cutting Their Own Margin to Get There
- How to Read a BOQ: The 10-Minute Guide That Saves Homeowners Thousands
- Jadual Bayaran Kontraktor Renovation: Rupa Jadual yang Adil & Tanda Bahaya yang Perlu Dielak
- Kitchen Renovation and Remodel Cost Malaysia 2026: Condo and Terrace, Cost per Item
- Kos Baiki Bumbung Bocor 2026: Upah Repair Atap, Tukar Genting Pecah, Flashing dan Waterproofing Bumbung Konkrit
- Berapa Kos Bina Rumah di Malaysia 2026? Harga Sebenar Ikut Kaki Persegi
- Kos Bina Rumah Atas Tanah Sendiri 2026: Panduan Banglo Setingkat
- Kos Bina Rumah Ikut Negeri 2026: Harga Sekaki di 10 Negeri dan Kenapa Boleh Beza 20%
- Harga Pagar Rumah 2026: Kos Buat Pagar Sekaki untuk Pagar Batu, Grill, BRC dan Pintu Pagar
- Kos Pasang Awning Rumah 2026: Harga Sekaki, Upah dan Contoh Awning 20x12 Kaki
- Kos Permit Ubahsuai Rumah 2026: Yuran PBT, Kelulusan Pelan Extend Dapur dan Denda Renovate Tanpa Permit
- Kos Renovate Bilik Air 2026: Harga Sebenar untuk Bilik Air 5x8 dan 6x10 Kaki
- Kos Renovate Dapur 2026: Dari RM8k Hingga RM60k — Apa Bezanya?
- Kos Tambah Bilik & Extension Rumah 2026: Panduan Harga Lengkap
- Kos Tukar Bumbung 2026: Genting vs Metal Deck — Perbandingan Harga
- Harga Wiring Rumah 2026: Senarai Harga Point, Upah & Kos Rewiring Penuh
- Projek Rumah Terbengkalai: Apa Jadi Pada Kewangan Anda Bila Kerja Terhenti Separuh Jalan
- Quantity Surveyor Fees in Malaysia 2026: The BQSM Scale, a Worked House Example, and When You Need a QS
- Quantity Takeoff in Malaysia 2026: How Each Trade Is Measured, With a Worked Room Takeoff
- Kos Bina Rumah 2027: Ramalan Harga Bina Rumah Sekaki Persegi, Upah dan Bahan Binaan
- Renovate or Rebuild Your House in Malaysia? 2026 Costs per sq ft, Demolition, Permits and a Worked Terrace Comparison
- Renovation Cost by Item in Malaysia 2026: Cabinets, Lighting, Shelving, Tiles, Water Heater and More
- House Renovation Cost Malaysia 2026: The Full Breakdown
- Why Renovating a Shoplot or Heritage Property in Malaysia Costs More Than It Looks
- Upah Cat Rumah 2026: Harga Sekaki, Kos Cat Rumah Teres dan Upah Cat Luar Rumah
- Upah Pasang Tiles 2026 dan Harga Tiles 2x2 / 1x1: Sekaki dan Semeter Persegi Ikut Saiz, Jenis dan Lantai atau Dinding
Wakkiro is operated by Rumah Kampong Sdn. Bhd., Pontian, Johor. More about the team.