Home › Blog › Renovation Cost by Item
Renovation

Renovation Cost by Item in Malaysia 2026: Cabinets, Lighting, Shelving, Tiles, Water Heater and More

Published 27 November 2026 · 8 min read · By Dr. Daing Hanum · Price data: Rasydan Abdulah, site engineer
Renovated Malaysian condo living room and foyer with a built-in shoe cabinet, TV wall shelving and warm downlights

In Malaysia in 2026, built-in cabinets and shelving cost about RM250–RM900 per foot run depending on material, a new light point RM80–RM120, a 13A socket RM90–RM140, 2x2 homogeneous floor tiles about RM62 per m² supplied and laid, and a water heater point RM200–RM300. A typical condo living room and foyer refresh with new floor tiles, paint, extra lighting and built-in units lands around RM9,000–RM10,500.

This is a unit price list for planning a renovation one item at a time. Labour, tiles, paint, ceiling and plumbing come from the Wakkiro rate book (Selangor, KL and Johor); cabinets, shelving, bathtubs and shower screens are market ranges and are labelled as such. Every line shows how the number is built, so you can check a contractor's quote against it.

Renovation unit price list 2026

Add 15%–30% for the contractor's overhead and profit when you compare these direct costs with a quote. Items marked market are not in our rate book.

ItemUnit costHow it is built
Hacking and strip-outRM120 per labour-dayGeneral labourer day rate
Debris disposalRM350 per lorry tripDisposal lorry, one trip
Floor screedabout RM33 per m²Cement-sand screed, materials and labour
Floor tiles 2x2 (600x600) homogeneousabout RM62 per m² (≈ RM5.80/ft²)Tile RM41.67/m² + laying RM20.83/m²
Wall tiles 300x600 ceramicabout RM53 per m²Tile RM22.22/m² + laying RM31.25/m²
Painting walls and ceilingabout RM6 per m²Sealer and two coats, materials and labour
Ceiling, cement board on frameabout RM48 per m²6mm board, frame and fixing
Light point (with switch)RM80 – RM120Surface wiring, cable and labour
13A socketRM90 – RM140Surface wiring
Aircond point, 20ARM180 – RM280Own circuit
Water heater pointRM200 – RM300With isolator
Plumber + helperRM260 per day + fittingsPlumber RM140 + helper
Cabinets, melamineRM250 – RM400 per ft runMarket
Cabinets, aluminiumRM350 – RM550 per ft runMarket, for wet areas
Cabinets, spray-painted MDFRM600 – RM900 per ft runMarket
Built-in acrylic bathtubRM1,200 – RM3,500 + RM800 – RM2,000 surroundMarket
Shower screen, installedRM500 – RM900 framed; RM1,200 – RM2,000 framelessMarket

Concealed wiring (cables chased into the wall) adds roughly 25%–30% to the electrical prices because of hacking, re-plastering and repainting. The full price list per point is in our house wiring price guide.

Cabinet and shelving renovation cost

Built-in units are priced per foot run: the length along the wall, whatever the height. Base cabinets, wall cabinets, wardrobes, shoe cabinets, TV consoles and open shelving are all quoted this way, so a 6 ft TV console at RM325 per ft run is RM1,950 whether it has doors or open shelves.

Check the quote states the carcass material, door material, hinge and drawer-runner brand, and whether the top (worktop or display top) is included. For kitchens, see our kitchen renovation cost guide.

Lighting renovation cost

Lighting has two parts: the point (cable from the DB box to the ceiling and a switch) and the fitting (the downlight or pendant you choose). Points cost RM80–RM120 each for surface wiring. If you are adding a plaster or cement board ceiling at the same time, the cables can be hidden above it without chasing walls, which avoids the concealed-wiring premium.

A practical check: count the points on the drawing or walk the house and count switches and ceiling positions. Multiply by RM100 for a midpoint estimate. A quote far above that should list extra items such as a new DB box (RM800–RM1,500) or a new circuit.

Floor, wall and ceiling finishes

For a 25 m² living room (about 270 ft²), new 2x2 homogeneous floor tiles cost around RM1,560 supplied and laid, plus about RM360 to hack the old tiles and RM835 for a new screed if the old one is uneven. Repainting the walls and ceiling of the same room (about 80 m² of surface) is around RM470. Tiles bought separately cost more per m² for small rooms because of cutting waste, so add 5%–10% to the tile quantity. Our tile laying rate guide breaks down laying rates by tile size.

Renovation in progress: kitchen cabinets being installed and a new ceiling light point being wired
Renovation in progress: kitchen cabinets being installed and a new ceiling light point being wired

Bathroom items: bathtub, shower and water heater

A new built-in bathtub typically costs RM3,000–RM6,500 all in (tub, surround, plumbing and waterproofing). Converting a bathtub into a walk-in shower with a framed sliding screen is about RM2,450–RM2,770 quoted for a standard condo bathroom. A water heater needs its own point (RM200–RM300) plus the heater unit, which varies by brand. The full itemised breakdown is in our bathroom renovation cost guide.

Worked example: condo living room and foyer refresh

A 25 m² living room with a small foyer: old floor tiles replaced, walls and ceiling repainted, three extra light points, two extra sockets, a 4 ft shoe cabinet and an 8 ft TV console with open shelving, both in melamine.

ItemWorkingCost (RM)
Hack old floor tiles3 labour-days × RM120360
New floor screed25 m² × RM33.41835
Floor tiles 600x600 homogeneous25 m² × RM62.501,563
Paint walls and ceiling80 m² × RM5.92474
Extra light points3 × RM100300
Extra 13A sockets2 × RM115230
Shoe cabinet, melamine4 ft × RM325 (market midpoint)1,300
TV console with open shelving, melamine8 ft × RM325 (market midpoint)2,600
Debris disposal1 lorry trip350
Direct cost8,012
Overhead and profit 15%–30%8,012 × 1.15 to × 1.309,214 – 10,416

In a condo, add the management deposit (often RM1,000–RM3,000, refundable) and lift protection. The built-in units are almost half of the bill here, which is typical: material choice for cabinets moves the total more than any other decision. For whole-house budgets by scope, see house renovation cost in Malaysia.

What an itemised renovation quote should include

How to check a renovation quote item by item

  1. Divide each line by its quantity and compare the unit rate with the list above. A rate 50% higher needs a reason, such as premium material or difficult access.
  2. Measure the foot runs yourself. Cabinets are the biggest lines; a 2 ft difference on a RM400 per ft run unit is RM800.
  3. Count the electrical points. Point counts are easy to inflate and easy to check.
  4. Ask for a payment schedule tied to progress, with a final retention until defects are fixed.

If you have a floor plan or drawing, upload it to Wakkiro to get the quantities and a line-by-line BOQ at current Malaysian rates.

What would your project actually cost?

Upload a drawing or describe the job — Wakkiro builds an itemised BOQ at current Malaysian rates, free.

Estimate My Project →

Related: Renovate or Rebuild Your House in Malaysia? 2026 Costs per sq ft, Demolition, Permits and a Worked Terrace Comparison

Frequently Asked Questions

How much does cabinet renovation cost in Malaysia?

Built-in cabinets are priced per foot run: melamine about RM250 to RM400, aluminium RM350 to RM550, solid wood RM500 to RM800 and spray-painted MDF RM600 to RM900. A 10 ft run of melamine base and wall cabinets is about RM5,000 to RM8,000.

How much does it cost to add lighting in a renovation?

Each new light point with a switch costs about RM80 to RM120 for surface wiring, plus the fitting you choose. Concealed wiring adds about 25% to 30% because the walls must be chased, re-plastered and repainted.

How much does shelving cost per foot in Malaysia?

Open shelving and wall units are priced like wall cabinets, about RM250 to RM400 per foot run in melamine. Solid wood or spray-painted finishes cost RM500 to RM900 per foot run.

How much does a water heater installation cost?

The water heater point with an isolator costs about RM200 to RM300. The heater unit is extra and depends on brand and type, and a plumber may be needed if the shower mixer must be changed.

How much does a living room renovation cost in Malaysia?

A 25 square metre condo living room and foyer refresh with new floor tiles, repainting, extra lighting and built-in shoe cabinet and TV console costs about RM9,200 to RM10,400 including the contractor's margin.

Get a full itemised estimate, free

Line-by-line BOQ for a new build, extension or renovation — in minutes.

Start Now →
About this guide. Written and reviewed by Dr. Daing Hanum, with price data from our site engineer Rasydan Abdulah. Figures come from the Wakkiro rate book and the sources named in the article. Drafts are prepared with AI writing assistance and checked before publishing; see our editorial policy. Seeing a different price in your area? Tell us.