Dr. Syafiq Affandi
Dr. Syafiq Affandi is the tech lead at Wakkiro. He builds the estimator: the drawing analysis that measures a floor plan, the takeoff that turns it into quantities, and the rate engine that prices those quantities with Malaysian rates.
What he does at Wakkiro
- Builds and maintains the estimator and its BOQ output.
- Runs the accuracy benchmark against the engineer-priced projects after every significant change, and publishes the results on the home page.
- Records product changes in the changelog, and keeps the user guide (English, Bahasa Malaysia) up to date.
How the estimator works
- Read the drawing. The floor plan is analysed for storeys, rooms, wet areas, doors, windows, roof form and the built-up area, each with a confidence level.
- Measure. Rooms are traced to scale and turned into quantities: wall area, floor and ceiling area, roof area on the slope, door and window counts, and electrical and plumbing points.
- Price. Each quantity is priced from the Malaysian rate book (materials, labour day rates, crew output and wastage, preliminaries, plant), adjusted for state and finish quality.
- Check. The total is compared with an independent QS benchmark, and the method is tested against ten engineer-priced projects before changes go live.
Where the drawing does not show something, the estimator uses a stated allowance rather than guessing silently, so you can see which lines to confirm with your contractor. The method behind the quantities is explained in our quantity takeoff guide.
Guides on estimating and the tool
- Best Construction Cost Estimator in Malaysia 2026: A Fair Scorecard and a One-House Test
- Quantity Takeoff in Malaysia 2026: How Each Trade Is Measured, With a Worked Room Takeoff
- What an Architectural Drawing Is Actually Worth to Your Construction Estimate
- Estimating Software for Small Contractors in Malaysia: What Actually Works
Wakkiro is operated by Rumah Kampong Sdn. Bhd., Pontian, Johor. More about the team.